Featured News - Current News - Archived News - News Categories

Town of Lewiston file photo.
Town of Lewiston file photo.

New Lewiston proposal for dedicated drainage division

Fri, Aug 21st 2026 06:00 am

By Michael Weiss

Lewiston Highway Department Superintendent

Over the years, the Highway Department’s approach to drainage maintenance has largely been reactive rather than proactive. Due to limited staffing, efforts have primarily focused on cleaning areas only after complaints have been received. While this has addressed immediate concerns, it has not provided our residents with a long-term solution to the growing drainage and flooding challenges facing our community.

Our current method of operation is no longer sustainable. Aging infrastructure, changing weather patterns, and years of deferred maintenance have placed an overwhelming demand on our existing workforce. The dedication of my current employees has allowed us to accomplish a tremendous amount, but they cannot continue to meet these increasing demands without additional support.

Since I took on the role of highway superintendent, Mr. Broderick and I have spent countless hours meeting with residents, visiting drainage problem areas, inspecting ditches and culverts, and evaluating recurring flooding concerns throughout our community. Doing so has provided valuable insight into both immediate needs and long-term improvements required to better serve our residents.

I completely sympathize with our community’s concerns – taking action to resolve these issues is top priority.

I remain fully committed to finding a lasting solution to our flooding issues. My goal is not to simply respond to complaints, but to develop a comprehensive drainage program that identifies problems before they become emergencies, prioritizes critical projects, and creates a preventative maintenance schedule that benefits every neighborhood.

With that said, it needs to be understood that this is not a realistic overnight solution to our problems but a long-term, ongoing project that will take time to complete. While not every issue can be resolved immediately, every concern should receive careful evaluation, honest communication, and a plan for moving forward. I plan to complete these projects while remaining fiscally responsible.

To effectively address our community’s drainage needs, I recommend establishing a dedicated drainage division as a part of our current Highway Department responsible for:

•Routine inspection and maintenance of roadside and off-road ditches, culverts and drainage channels

•Preventative cleaning programs rather than complaint-driven responses

•Flood mitigation planning and project development

•Mapping and documenting drainage infrastructure

•Coordinating drainage improvements with road projects

•Responding efficiently to emergency flooding events

•Maintaining regular communication with residents regarding drainage concerns

Dedicated budget line

•Perforated drainpipe

•Drainage gravel or crushed stone

•Landscape fabric

•Solid drainpipe

•Pipe connectors, couplings, elbows, and end caps as needed

•Catch basin or drain inlet

•Topsoil and sod or mulch to restore the area

Staffing requirements

•Three-man crew

The staffing structure would allow for both routine maintenance and response while planning future infrastructure improvements along with help of current staff.

Community partnership

Residents also play an important role in maintaining our drainage system. I respectfully ask everyone to help by avoiding the placement of brush, leaves, grass clippings or other debris in roadways, roadside ditches and drainage channels. These materials restrict water flow, clog culverts and catch basins, and contribute to localized flooding during heavy rainfall.

By working together, we can improve drainage performance throughout the community.

Long-term commitment

Approximately between 2012-14, the highway superintendent, at that time, cut the drainage division. I firmly believe we need to reinstate this division.

This proposal represents more than the creation of a new drainage division; it represents a long-term commitment to the residents of our community. My objective is to build a drainage program to protect homes, roadways and public infrastructure for years to come.

By investing in a drainage division with dedicated personnel equipment and proactive maintenance, we can move away from a complaint-driven system and move toward one that prevents these events from happening before it occurs. While these improvements will take time, planning and investment, I am committed to working alongside this community, employees and current administration to develop lasting solutions that improve the quality of life for everyone.

Hometown News

View All News